Excel Engineering’s Expertise Enhances Fortune 100 Client’s Dust Collection System A U.S. manufacturing company needed to modernize equipment and control systems to achieve safety and environmental goals.
Pharmaceutical Production Facility – FTBatch Control System Modernization A pharmaceutical manufacturer (Client) in the Twin Cities, MN area needed to modernize their existing FactoryTalk Batch Control System.
LPG Facility – Automation Overhaul Flint Hills Resources (FHR) purchased the Wescott LPG production facility from Xcel Energy in late 2018 and thereafter began a project to upgrade various aspects of the plant, including the control system.
New Protein Production Facility Control System A Life Science reagent manufacturer (End-User) in the Twin Cities, MN area determined the need to create a new production facility to produce ancillary material protein products under GMP conditions. Various system components required the development and implementation of a Process Control System (PCS).
Industrial Manufacturing Facility – Site Medium Voltage Evaluation & Detail Design A large industrial manufacturing Client requested investigation of existing aging unit substations at an existing operating facility located in Decatur, Alabama to determine a renewal plan for the site.
Industrial Manufacturing Facility – Annual Arc Flash Studies A large industrial manufacturing Client requires ongoing annual arc flash, coordination and device evaluation studies to be performed throughout their major manufacturing / research facility in Maplewood, MN.